Skip to content
PackableSofa — Refined γ-2 (abstract soft curve in box) PACKABLE SOFA
PackableSofa factory campus — Building 1

Inside the Factory

Where Box Magic Happens.

Frame, foam, cover, and packing — all under one roof.

Capacity

Production Snapshot.

260K

Total sqf footprint

18

Active production lines

1,200

CTN/month sustained

28

Average lead time (days)

Workshops

Six Integrated Lines.

Frame Workshop at PackableSofa factory

Frame Workshop

Kiln-dried pine + plywood. CNC cutting, dowel jigging.

Foam Workshop at PackableSofa factory

Foam Workshop

CertiPUR-compliant HD foam, 7-day rest curing.

Cover Sewing at PackableSofa factory

Cover Sewing

Industrial overlock + double-needle. 100k Wyzenbeek fabric.

Final Assembly at PackableSofa factory

Final Assembly

60 units/operator/day. Hand-finished QC.

Vacuum Compression at PackableSofa factory

Vacuum Compression

95% air evacuation, double-wall carton, edge protectors.

Shipping & Loading at PackableSofa factory

Shipping & Loading

Container dock with photo doc per unit. SGS PSI accessible.

Production Flow

One Sofa, Nine Steps, ~18 Days.

From PO confirmation to container loading. Mass production runs the same flow in parallel batches of 50–200 units.

01

Brief

Day 0

PO or sample brief confirmed

02

Frame

Day 1–3

CNC cut, dowel-jigged hardwood

03

Foam

Day 4–11

HD foam, 7-day rest curing

04

Sewing

Day 8–10

Cover cut, overlocked, fitted

05

Assembly

Day 12–14

Hand-finish + station QC

06

Compress

Day 15

Vacuum 95% air evacuation

07

Inspect

Day 16

Photo-doc per unit + PSI

08

Container

Day 17

Loading + customs paperwork

09

Ship

Day 18+

FOB / CIF / DDP per Incoterm

Want a Virtual Factory Tour?

Live Zoom walkthrough of any workshop. Same-week availability.

Schedule Tour